Ministry of Roads & Highways > Posts > News > Contractor begins work on roads affected by flood in Upper West Region
Contractor begins work on roads affected by flood in Upper West Region
August 26, 2021
News

One out of four construction companies contracted by government to fix the major roads affected by the flood that hit the Upper West Region has commenced work.
The Lebanese-Ghana-based construction firm, P&W Ghanem is working on the Goriyiri section of the road located on the Wa-Nadowli highway.

The bituminous road was completely washed off leaving the culvert.
The ongoing work follows a visit by the Roads and Highways Minister, Kwesi Amoako-Atta, to the region after the disaster. He pledged to have the roads fixed within the shortest possible time.
More here: https://www.myjoyonline.com/contractor-begins-work-on-roads-affected-by-flood-in-upper-west-region/?param= / https://youtu.be/cIWfcmegRT4
Source: Myjoyonline
Recent Posts
Categories
Tags
Abolishment of Road Tolls
Abwakwa-Tanoso Road
Bawku
Bawumia
Bolgatange
Bridge
Buipe Bridge
Central Regional Tour
Cessation of Road and bridge toll
Commissioning
Contractors
Dompoase Junction-Aputuogya Road
Dualization
Eastern Region - Roads
Expression of Interest
Floods
Inner Ring
Jasikan
Kaneshie
Kumasi
Lake Road Extension Project
Nana Akufo-Addo
Ohwimase-Twedie Road
Oti Region
Pokuase Interchange
Polimakom
President Akufo-Addo
Project Inauguration
River Oti
Road Safety Report
Road Tolls
SONA
Stakeholders
Sunyani Road Phase II
Tamale Interchange
Toll Collection
Transport Sector Review Conference
TSIP
Twifo Praso
Upper West Floods
Veep
Vice President
Washed off roads
Yendi
“Yiri Maalibu Naa”
Recent Comments