Contractor begins work on roads affected by flood in Upper West Region


One out of four construction companies contracted by government to fix the major roads affected by the flood that hit the Upper West Region has commenced work.

The Lebanese-Ghana-based construction firm, P&W Ghanem is working on the Goriyiri section of the road located on the Wa-Nadowli highway.

The bituminous road was completely washed off leaving the culvert.

The ongoing work follows a visit by the Roads and Highways Minister, Kwesi Amoako-Atta, to the region after the disaster. He pledged to have the roads fixed within the shortest possible time.

More here: https://www.myjoyonline.com/contractor-begins-work-on-roads-affected-by-flood-in-upper-west-region/?param= / https://youtu.be/cIWfcmegRT4


Source: Myjoyonline

Leave a Reply

Your email address will not be published. Required fields are marked *

Drop MRH a message

Give us a call or fill in the form below and we'll contact you. We endeavor to answer all inquiries within 24 hours on business days.