Press Release: Traffic Diversions on Tema Motorway | 4th September 2023
The Ministry of Roads and Highways acting through the Department of Urban Roads wishes to announce to the public that owing to the construction of the bridge over the motorway to connect Flowerpot to East Legon as part of the Flowerpot Interchange project, traffic diversions are being implemented on the Accra-Tema Motorway around the construction zone.
Motorists are advised to exercise caution and drive at the posted speed limit and adhere to the traffic management signs provided during this period.
6 no. height restriction gantries (4.5 metres) will be positioned at different locations across the Accra – Tema Motorway prior to reaching the construction zone. Vehicles exceeding 4.5 metres in height will be redirected to exit the stretch through the designated route.
Recent Posts
- Press Release: Unauthorized Billboard at the Flowerpot Interchange
- Ministry of Finance Issues commencement authorisation for Road Infrastructure Projects under the Big Push Programme
- Government to Release GH¢4bn to Resume Stalled Road Projects
- Prez Mahama is Committed to Open-up Afram Plains once and for all” – Hon Agbodza
- Hon Agbodza inspects work on Buipe, Yapei Bridges







Recent Comments